By Richard Sheckler, Wayne, Ohio.

Spot welding of panels inside the tank for strength and to plug the rust holes. The tunnel is removed to get inside. The last step before reinstalling the tunnel is to weld the knee pad brackets in place. When the tunnel is TIG welded in place, the inside is sealed with fuel resistant epoxy.

IMG_8360_v1

IMG_8527 (2)_v1

IMG_8526

IMG_8528 (2)_v1

IMG_8531 (2)_v1

IMG_8519 (2)_v1

 

IMG_8352_v1IMG_8515 (2)_v1

IMG_8513 (2)_v1

IMG_9119_v1

Comments are closed.